Hanes EcoSmart Unisex Fleece Sweatshirt (Big & Tall Sizes Available)
Hanes EcoSmart Unisex Fleece Sweatshirt (Big & Tall Sizes Available)
USD 16.00 USD
Specifications
| Color | Blues |
| Shade | Deep Royal |
| Brand | Hanes |
| Type | Sweatshirt |
| Size Type | Regular |
| Department | Men |
| Style | Pullover |
| Features | All Seasons |
| Theme | Classic |
| Fabric Type | Fleece |
| Performance/Activity | Bodybuilding |
| Product Line | Hanes |
| Pattern | Solid |
| Material | Cotton Blend |
| Sleeve Length | Long Sleeve |
| Neckline | Crew Neck |
| Fit | Regular |
| Season | Winter |
| Garment Care | Machine Washable |
| MPN | OP160 |
CLASSIC CREWNECK STYLE Classic. Whatever you want to call it, this Hanes EcoSmart® fleece sweatshirt is a wardrobe staple. Double-needle stitching at the neck and armholes further enhances the quality and strength.
Related Items
© 2026 · Your Website. Theme by HB-Themes.






